Gas-Fired
(Combined Cycle)




The Owner of a gas-fired power plant executed an EPC agreement to integrate two gray-market HRSGs and one gray-market STG with the existing plant.  The EPC had difficulty with the HRSGs, STG, design, productivity, and quality.  The EPC filed an Arbitration demand to resolve outstanding Proposed Change Orders (PCOs), and the Owner counterclaimed for defect corrective costs.  An Expert Report was developed which analyzed entitlement, schedule and damages.  Expert Testimony was provided at the Arbitration.

Waste-Fired



The cause of alleged design-related cost overruns was evaluated to defend the A/E for its work on an 18mW refuse-burning power plant which required a peer-review of the design.  It was determined that the code-required peer design review caused the additional costs due to unreasonable demands for 'proof' of the quality of process, piping, and structural design.  An Expert Report was prepared allowing a successful negotiation between the A/E and the Owner.

Coal-Fired




The EPCM had a lump-sum contract to design and build this 3,200 MW coal-fired power plant.  Services included risk management, planning & scheduling, estimating, cost control, and certain contract development across all phases of the project (design, procurement, construction and start-up).  Duties also included pre-qualifying bidders and the development of fair-value estimates to evaluate bids.  All estimates (project-wide as well as fair-value) were analyzed with the Monte-Carlo approach to evaluate project cost risk.  The project completed ahead of schedule and under budget.